Order to comply

Get Your Order to Comply Response Moving Without Guessing What the Municipality Needs Next.

Post the order, property details and available documents once. Compare professionals for permit drawings, engineering, zoning, municipal response and correction-document support — all in one place.

Order to ComplyCOMPLIANCE REQUIRED
Project: Building compliance • Order attached
Issue identified

The order identifies a contravention and required corrective action. The right response starts with the actual wording, compliance date, existing permits and municipal records.

Project file

Order • compliance date • photos • existing drawings • permit records • inspection notes • municipal correspondence

Next scopePermit / drawings
ProfessionalCompare quotes
AuthorityMunicipality decides
ORDER TO COMPLY

Permit.ca is a network connecting clients with independent professionals. Each professional is responsible for their own work. Permit.ca does not guarantee municipal approvals.

Order & Permit
Documents Organized
Compare Relevant
Professional Scopes
Milestone-Based
Payments
One Project
Workspace
First priority

The Order Sets the Problem. Your Response Starts With Its Exact Requirements.

An Order to Comply should be treated as a project-specific enforcement document, not a generic permit problem. Start with the listed contravention, required action, compliance date and the records the municipality has on file.

✓
Work may not match permit or code requirementsThe order may identify a contravention that requires drawings, permit documentation, revisions, inspections or other corrective steps.
✓
Existing work may need to be documentedPhotos, dimensions, approved plans and current conditions can help the responsible professional understand what has already been built.
✓
A deadline may applyThe order can require compliance immediately or by a stated date. The response path should be organized around the actual order, not assumptions.
✓
More than one discipline may be involvedStructural, architectural, mechanical, electrical, plumbing, zoning or permit-coordination scopes can overlap depending on the contravention.
Do not assume that submitting documents means the order has been satisfied. The issuing inspector, chief building official or other applicable authority determines whether the required compliance has been achieved.
Possible response pathProject-specific
01
Read the order and deadlineContravention, required action, compliance date and issuing authority
START
02
Gather the existing project recordPermits, approved plans, photos, inspection notes and correspondence
DOCS
03
Define the professional scopeDrawings, engineering, zoning, permit revisions or other documents as applicable
SCOPE
04
Submit and respond to commentsApplication, correction documents, revisions or follow-up requested by the authority
REVIEW
05
Authority confirms compliance statusOnly the applicable authority determines whether the order has been satisfied
AUTHORITY
Compare the right scope

One Order to Comply Can Require More Than One Professional.

Compare what each professional is actually quoting instead of assuming every compliance scope includes the same drawings, engineering, zoning work, permit revisions or municipal follow-up.

Permit.ca does not interpret your order or decide what will satisfy it. The issuing authority and the independent professionals responsible for the work determine the applicable requirements.

Compare Order to Comply support quotes
Illustrative UI - live quotes
Permit Designer / BCIN

Existing/proposed drawings, permit-document updates or revision scope where applicable to the project and jurisdiction.

Scope · Timeline · Credentials
Review quote
Structural Engineer

Structural assessment, calculations or engineering documents when the identified contravention involves structural work.

Scope · Timeline · Deliverables
Review quote
Permit Consultant / Coordinator

Application organization, municipal correspondence, comment tracking and revision coordination within the agreed scope.

Scope · Timeline · Revisions
Review quote
Planning / Zoning Professional

Zoning or planning support where use, setbacks, parking, density or another planning issue affects the compliance path.

Scope · Timeline · Requirements
Review quote
What the project can involve

From the Order to a Documented Compliance Response

The exact path depends on the law behind the order, the municipality, the listed contravention and what has already been built. These are common categories of work independent professionals may quote.

01

Order & Record Review

Review the order, compliance date, permit history, approved plans, inspection notes and available correspondence.

02

Existing-Condition Documentation

Capture current conditions so the professional scope reflects the actual property and work already completed.

03

Drawings, Engineering & Revisions

Prepare project-specific permit documents, engineering or revised plans where the responsible professional determines they are required.

04

Municipal Response Support

Organize submissions, track comments and coordinate revisions within the professional’s agreed scope.

Important: Permit.ca is a network. It does not issue, cancel, discharge or interpret Orders to Comply; provide legal, architectural or engineering advice; inspect work; certify compliance; or guarantee permit approval or municipal acceptance.
How Permit.ca works

Post. Compare. Fund. Track.

STEP 01

Post the Order & Project

Share the Order to Comply, property address, compliance date, photos, available drawings, permit records and municipal correspondence.

STEP 02

Compare Professional Quotes

Review proposed scope, timeline, credentials and deliverables before choosing who to hire.

STEP 03

Agree & Fund a Milestone

Agree on the professional scope and fund the current milestone through the platform before that stage begins.

STEP 04

Track Documents & Responses

Keep files, messages, milestone submissions, municipal comments and revisions attached to one project record.

Milestone payments

Fund One Agreed Stage at a Time.

Keep payments tied to the agreed professional scope — such as record review, permit drawings, engineering, permit revisions, application support or municipal-response documentation.

01

Fund

Client funds the agreed milestone through the Permit Wallet.

02

Submit

The professional submits the agreed milestone deliverables.

03

Approve

Client reviews the submission and approves or raises an issue.

04

Payout

The professional receives the approved payout seven days after client approval.

One project workspace

Keep the Order, Drawings, Quotes and Municipal Comments Together.

Manage professional quotes, the Order to Comply, permit drawings, engineering files, milestone submissions, municipal correspondence and revisions from one organized project record.

permit.caProjectsQuotesMilestonesFilesPayments

Order to Comply Response Active

QuotesReviewing
MilestonePermit Set
Files12
Order to ComplyUploaded
Existing-condition recordsComplete
Permit / correction documentsIn Review
Municipal commentsTracked
FAQ

Order to Comply Questions

What should I do after receiving an Order to Comply?

Read the order carefully, note the listed contraventions, required actions and compliance date, and identify the issuing authority. Then compare independent professionals for the permit drawings, engineering, zoning or municipal-response scope the situation may require. The authority decides whether the order has been satisfied.

Can Permit.ca clear or discharge an Order to Comply?

No. Permit.ca is a network and cannot cancel, clear, discharge or determine compliance with a municipal order. Permit.ca helps you compare independent professionals who can assist with the documentation and professional services needed to respond.

Why is an Order to Comply issued?

The reason depends on the order and jurisdiction. Under Ontario’s Building Code Act, an inspector may issue an order when a contravention of the Act or Building Code is found. Other municipal bylaws can also use orders to require corrective action, so the actual order controls the response.

What happens if I do not comply with the order?

Consequences depend on the law and the order. Under Ontario’s Building Code Act, failure to comply with an Order to Comply can lead to further enforcement, including a Stop Work Order. The order itself should be reviewed for the required action, timing and applicable appeal information.

Will I need drawings, engineering or a building permit?

Possibly. The required documents depend on the contravention, work already completed, existing permits, property and municipality. An independent professional should review the project and confirm the appropriate scope.

What information should I include when posting my project?

Include the Order to Comply, property address, compliance date, photos, existing drawings or permits, inspection notes if available, a description of work already completed and any municipal correspondence.

Does Permit.ca provide legal or engineering advice about the order?

No. Permit.ca does not provide legal, architectural or engineering advice. Independent professionals provide their own regulated services, and legal questions or appeal questions should be directed to an appropriate legal professional.

Do clients pay a platform fee?

No. Clients can post a project and compare quotes without a client platform fee.

Received an Order to Comply?

Get the Right Permit Professionals Around the Problem Before the Compliance Deadline Gets Closer.

Post the order and project details once. Compare independent professionals for the drawings, engineering, zoning, permit-revision and municipal-response scope your project may need.